Built by project controls professionals — IT · Construction · Infrastructure

Manage the project.
Not the reports.

One platform for schedule, cost, risk, and people.
From a $250k fit-out to a $50M program — the tool we couldn't find, so we built it.

$25/mo
Every Feature
10K
MC Iterations
10+
Chart Types
XER
P6 Compatible
3s
Exec Report Export
30s
Project Setup
We still put our boots on.
This is the tool we couldn't find.

132 Engineering — Project Controls Consultancy

We run real projects. The software gets tested against reality every time someone on our team uses it on a live job.

That feedback loop doesn't exist anywhere else at this price point.

The reporting problem

Your report shouldn't cost
a month of your team's time.

Every reporting cycle. Different tools. Same outcome.

Before 132
4 wks
to produce one status report
  • 3 weeks chasing data across 6 separate systems
  • A team of 4 spending a week building the deck
  • Data already two weeks old by the time anyone reads it
  • Teams call: which Excel is the correct one?
  • Risk register. Last updated: nobody knows.
  • And it all happens again next month
With 132
3 sec
your next report is already built
  • Data lives in one place. Always current.
  • Actuals flow from field to cost report automatically
  • EVM recalculates when numbers change
  • Exec deck exports from the same data your PM sees
  • No translation layer. No curation. No version problem.
  • Your team gets their month back
What you're replacing
P6
Primavera P6 / MS Project
Schedule — disconnected from everything else
XLS
Excel — Cost Tracking
"COST v7 FINAL FINAL USE THIS ONE"
Risk Register Spreadsheet
Another Excel. Last updated: who knows.
Email Chains for LEM Approvals
Buried in inboxes. No audit trail.
BI
Power BI Dashboard
Someone built it once. Nobody maintains it.
Timesheet System
Separate. Never reconciles with cost actuals.
Replaced by one platform
132 Platform
Schedule · Cost · Risk · Timesheets · LEMs · Reporting
One data model. Always current.
One platform

Stop stitching
tools together

Most projects run across 4–6 systems that don't talk to each other. Data gets copied, delayed, or lost. Decisions get made on last month's reality.

  • 01
    One source of truth
    Change a cost actual and your EVM updates. Approve a contractor sheet and it flows into the report. Everything connects because it was never separate.
  • 02
    Scales with your project
    Managing a single $250k job or a portfolio of $50M programs — same platform, same workflow, same price.
  • 03
    Prefer Excel for setup? That's fine.
    Upload a template and your project loads in minutes. We know how the industry works.
  • 04
    Your exec sees what your PM sees
    Same data. Right now. No translation layer. No curation step. No surprises at the monthly meeting.
Everything you need

Nine modules.
One data model.

Every feature available from day one. No tiers, no locks. Use what you need — every module is optional.

Know your critical path
CPM Scheduling

Forward/backward pass, float calculation, Gantt visualization, WBS structure, and P6 XER export. Your schedule talks to your cost and risk.

P6 XER Export
Know where your money went
Cost Management

Three-point estimates, actuals with source tracking, breakdown codes, committed vs forecast vs actual in one view.

Three-Point Estimates
Know what could go wrong
Risk Register

5×5 risk matrix, pre/post mitigation scoring, risk-to-cost linking, EMV exposure. Directly feeds Monte Carlo.

MC Linked
Know your probability range
Monte Carlo

10,000 iterations. Triangular, PERT, or normal distributions. Ten chart types with plain-English explanations of what you're seeing.

10 Chart Types · P5–P95
Know your performance today
Earned Value

Full AACE-compliant EVM: PV, EV, AC, CPI, SPI, EAC, TCPI, VAC. Baseline snapshots with variance history.

AACE Compliant
Know what contractors spent
Contractor LEMs

Daily/weekly Labour, Equipment, Materials. Draft → Submit → Approve → auto-rollup into cost actuals. No email chains.

Auto-Rollup to Actuals
Know where your team's time went
Timesheets

Weekly grid, project-activity allocation, submit/approve workflow, overtime flagging, resource loading matrix.

Resource Loading
Know the full picture
Programs & Portfolio

Group projects into programs with aggregated KPIs. Portfolio RAG dashboard, gap detection, executive reporting.

RAG Dashboard
Know your combined exposure
Synthesis Analysis

Cross-project workspace. Select projects and sections, run combined Monte Carlo, export to PowerPoint and Excel.

PPTX + Excel Export
Live analysis output

Charts that tell you
something useful

Every chart type includes a plain-English explanation of what you're seeing and what to do about it. Not just a graph — a decision.

Sensitivity Tornado — Cost Drivers
Which risks and activities drive the most variance
Monte Carlo — Cost Distribution
10,000 iterations · P10 through P90 confidence
EVM Trend — CPI & SPI
Performance indices over 12 reporting periods
How it works

Set up in minutes,
not months

No consultants. No IT department. No six-month rollout.

01
Create Your Project

Name it. Add sections. Start. Upload breakdown codes or build as you go. Import from P6 XER if migrating. Zero mandatory fields beyond the name.

02
Load Your Data

Web forms or Excel templates — whichever is faster for you. Three-point estimates available throughout. Your data stays your data.

03
Run the Analysis

Monte Carlo simulates 10,000 scenarios. EVM calculates indices. Gap detection flags what's missing. Everything recalculates automatically.

04
Report in 3 Seconds

Export to PowerPoint and Excel. Share the portfolio dashboard with leadership. Your report has been building itself all month.

Why it works when others don't

Built for the person
running the project

BCG research: 70% of construction digital implementations fail. The reason is always the same — the tool was built to satisfy a dashboard, not to help the PM.

Zero mandatory fields
Create a project in 30 seconds. Structure grows as your data grows. Nothing blocks you from starting work immediately.
One data model
Schedule, cost, and risk share one source of truth. Change one and the others update automatically. No manual copying. No version problem.
No forced workflows
Use three-point estimates or single values. Use LEMs or don't. Every module is optional. The platform adapts to your process.
Reality transferred to software
The inputs, workflow, terminology, approval chain — everything maps to what actually happens on a job site. Not what someone guessed from an office.
Realistic executive reporting
Your exec sees exactly what your PM sees. Same data, right number. Reporting is a byproduct of running the job — not a separate job.
One price, every scale
From a single $250k project to a $50M portfolio. Same platform, same clean interface, same price. No tier penalties for growing.
Pricing

One plan.
Everything included.

No tiers. No feature gating. No per-project charges.

Every Feature · Cancel Anytime
$25
per month · includes 2 seats
  • Unlimited projects & programs
  • Monte Carlo · EVM · CPM · Risk Matrix
  • PPTX + Excel + XER export
  • Timesheets + contractor LEMs
  • Portfolio dashboard + synthesis
  • Custom roles & permissions
  • Excel template import
Get Started Now Want to see it first? Request a demo →
$12
Seats 3–25
$9
Seats 26–75
$6
Seats 76+
Think about it this way
What does your current reporting cycle actually cost? Four people. Three weeks. Every single cycle. Your platform costs $25 a month.
FAQ

Common
questions

Anything else? Email us directly.

Yes — every cost line and activity uses optimistic, most likely, and pessimistic values. These feed directly into the Monte Carlo engine. If you only have a single estimate, enter it as the most likely — the other fields are optional.
The platform exports to P6 XER format including activities, predecessors, relationships, calendars, and WBS structure. You can move data into P6 for clients or partners who require it.
10,000 iterations sampling from your three-point cost and schedule estimates using configurable distributions (triangular, PERT, or normal). Output shows probability distributions, sensitivity analysis, and confidence levels from P5 to P95.
PMs create LEM sheets for contractor work (labour, equipment, materials). Each sheet goes through draft → submit → approve/dispute. On approval, the total automatically rolls into cost actuals and triggers the EVM rollup. No double entry, no email chain.
No. Zero mandatory fields means you use what you need and ignore the rest. A PM running three small jobs gets the same platform as someone managing a $50M program — they just use fewer modules. Complexity is available when you need it, invisible when you don't.
PowerPoint (PPTX) with charts and metrics on formatted slides, Excel (XLSX) with EVM summary and risk data, P6 XER for schedule data, and PNG for individual charts. All exports work for single-project and cross-project synthesis analysis.
No. $25/month, cancel anytime. Every feature is included from day one — no tier gating, no feature locks, no onboarding fee, no consultant required. Want to see it working first? Email us at info@132eng.com and we'll set something up.
132
Get started

Stop managing
the reports.

One platform for schedule, cost, risk, and people. Built by project controls professionals who still run projects. You're up in 30 seconds.

No free tier · no contract · cancel anytime · no consultants required

Theme